
Add to Cart
Capacity 150m3 Mobile Concrete Batching Mixer Plant Mxing Concrete JS3000
Bolted Cement Silo A / cement bin storage silo, is widely used in mobile cement mixing plant for road building, house building, bridge building, port transportation, etc.,
Installment: This cement silo is composed of steel sheets connected through bolts, it is very easy to assemble and disassemble. The experienced workers can finish the cement silo installation through the installation video or installation instruction.
Capacity: This bolted cement silo is available for 50ton, 100ton, 200ton, 300ton, 500ton, 1000ton. The final size is designed according to local site requirements based on the local environment, so each cement silo solution is unique for customer.
Our factory is a leading manufacturer of steel silo for more than 10 years, which has produced a great deal of silos for the domestic and foreign customers and received high praise. Our excellent designers who have about 10 years' experience can design the steel silo according to customers' needs. If you have any requirement, please just tell us.
Model | HZS25 | HZS35 | HZS50 | HZS75 | HZS150 |
Theoretical Productivity (m3/h) | 25 | 35 | 50 | 75 | 150 |
Mixer | JS500 | JS750 | JS1000 | JS1500 | JS3000 |
Batching System | PLD1200 | PLD1200 | PLD1600 | PLD2400 | PLD4800 |
Discharging Height(m) | 1.7-3.8 | 2.5-3.8 | 3.8 | 3.8 | 4 |
The Max. Diameter of the aggregates (mm) | 60-80 | 60-80 | 60-80 | 60-80 | 60-80 |
Automatic Cycle Period(s) | 60 | 60 | 60 | 60 | 60 |
Weighing precision of Aggregate | ±2% | ±2% | ±2% | ±2% | ±2% |
Weighing precision of Cement | ±1% | ±1% | ±1% | ±1% | ±1% |
Weighing precision of Water | ±1% | ±1% | ±1% | ±1% | ±1% |
Weighing precision of Additive | ±1% | ±1% | ±1% | ±1% | ±1% |
Power(kw) | 50.25 | 64.4 | 105 | 139 | 260 |
I. After-sales service commitment:
1. Service purpose: quick, decisive, accurate, thoughtful and thorough.
2. Service goal: the service quality wins users' satisfaction.
3. Service efficiency: if the equipment fails during the warranty period or the warranty period, the supplier can reach the site within 24 hours after receiving the notice and start the repair.